Front Line Power Construction worked on this reconductor project to increase capacity. Specific scope included removing more than thirteen thousand feet of small conductor and replacing with 600AAC feeder main, replacing a dozen wood poles with fiberglass utilizing hydro-vac installation methods, and outfitting each pole with the appropriate 3-phase transformers, insulators, brackets, grounding devices, and other necessary hardware.