With this project, Front Line’s specialized professional boring services allowed them to handle the replacement of several hundred feet of streetlight conductors. Our expertise came into play when replacing damaged sections caused by cable cuts or excavation at a specific location, ensuring the restoration of safe and reliable streetlight infrastructure.